| Availability: | |
|---|---|
| Quantity: | |
PRODUCT FEATURE
What is integrated processing equipment?
Integrated sewage treatment system is a comprehensive treatment facilitythat can effectively handle various types of wastewater, including homesewage, industrial wastewater and rainwater runoff, etc.
How It Works
The package sewage treatment plant principle is a kind of biochemical treat-mentwhich combine activated sludge microbiological method and new bio-logical membranemanner. In treatment process, large bacteria and bacteriamembrane update, adoptbiological carrier, improve the contact eficiency ofmicro- organism and pollutantmatter in sewage.
Item | YMSZ-1 | YMSZ-3 | YMSZ-5 | YMSZ-7.5 | YMSZ-10 | YMSZ-15 | YMSZ-20 | YMSZ-30 | |
capacity(m³/h) | 1 | 3 | 5 | 7.5 | 10 | 15 | 20 | 30 | |
equipment nm | 1 | 1 | 1 | 1 | 2 | 2 | 2 | 3 | |
Primary settling tank | 1.8 | 5.5 | 9 | 14 | 18 | 27 | 36 | 50 | |
Contact oxidation tank(m³) | 5 | 14.5 | 24 | 36 | 44 | 63 | 83 | 130 | |
Secondary settling tank surface load(m³/㎡h) | 1.2 | 1.3 | 1.3 | 1.3 | 1.2 | 1.2 | 1.5 | 1.5 | |
Disinfection tank(m³) | 0.6 | 1.8 | 4 | 4 | 5.5 | 8 | 10 | 15 | |
Air blower | model | HC-25IS | HC-30IS | HC-50IS | HC-50IS | HC-60IS | HC-80IS | HC-100IS | HC-100IS |
model | 0.4 | 0.75 | 1.5 | 2.2 | 2.2 | 3.7 | 5.5 | ||
units | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | |
sewage pump | model | AS10-2CB | AS16-2CB | ||||||
power(km) | 1 | 1.6 | |||||||
Total Welght(t) | 5.5 | 6.5 | 8 | 11 | 17 | 20 | 21 | 29 | |
Occupy area(m³) | 6 | 14 | 20 | 30 | 50 | 65 | 75 | 115 | |
The basic biochemical treatment processesinclude: AO, MBBR, SBR, and MBR
OEMPAEAASESFWCNT
29+
With 28 Years' Experiencein Global WastewaterEquipment Supply
120+
Our Services HaveGained Recognitionin More Than 120Countries
50000m2
A Production FacilitySpanning 50,000Square Meters
3D Process Flow Diagram3D Visualization Solution for intuitive process understandingand seamless communication.
Anaerobic Tank: Degrades organic matter, breaking down macromolec-ular pollutants into small molecules.
Anoxic Tank: Denitrifies wastewater, converting nitrate nitrogen intonitrogen gas for removal.
MBBR Tank: Aerobic biological treatment, degrading COD and ammonianitrogen to purify water quality.
Lamella Clarifier: Separates sludge and water, removing suspendedsolids and settled sludge.
Equipment Room: Houses core equipment such as pumps and blowersto ensure stable system operation.
More details and advantagesEquipment accessories and production
100% premiumRaw materials
We use high-quality thick steelplates treated with hot-dipgalvanization, ensuring a servicelife of over 10 years.
Compact designwith high integration
All functional units are integrated intoa single carbon steel or stainless steeltank. It can be buried undergroundor placed above ground, requiringminimal space.
AtellissntControl
PLC automatic control systemenables real-time monitoring andautomatic regulation, ensuringefficient and stable effluent quality.
High efficiency withguaranteed watercompliance
The water quality is stable,andit is not easy to producesludgeexpansion, which helpsenvironmentalprotectionacceptance
FACTORY WORKSHOP
Yimei Environmental EngineeringCompany was established in 1988 andhas a history of 37 years up to now. Itis an environmental protectionequipment manufacturer integratingR&D, production, sales and service.
Safe delivery & shipping
Ensure efficient, precise, and secure product delivery to customers.
Delivery time
Sample: 15 working days after receiving the full payment uniformly;The production lead time is approximately 30-150 days,depending on customizationrequirements.
Payment methodsT/T, Alibaba Secure Payment, L/C, Western Union, Paypal, Credit Card, etc.
1. How to buy your idea products?
A: You can provide us your water sources, water quality, flow rate and ground area (connect us for more details).
2. How to pay?
A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing70% balance before loading by TT.
3.What is the delivery time?
A: lt depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.
4.How to pack the products?
A. We use standard package. if you have special package requirements, we will pack as required but the fees will be paid by
customers.
5.How to keep your equipments from corrosion?
A: We use the world-famous paint, like SigmaCoatings,PainBow,etc. What's more, we paint strictlyaccording to the standard process.
6. How do you manufacture your equipment ?
A:Our machining technology includes laser/plasma cuting, automatic welding,CNC cutting andbending.
7.How to install after the equipments arriving destination?
A. We will provide detailed illustrations to you. lf it is necessary, we wil send technicians to helpyou. However, the visa fee,
air tickets, accommodation, wages will be paid by buyers.