| Availability: | |
|---|---|
| Quantity: | |
Packaged sewage treatment plant
The basic biochemical treatment processes include: AO, MBBR,SBR, and MBR
Packaged sewage treatment plant was Our company based on the SBR techniques (sequencingbatchreactor) developed a new kindmatched equipmentwhich can make up SBR many deficient
PRODUCT FEATURE
The package sewage treatment plant principle is a kind of biochemical treat-mentwhich combine activated sludge microbiological method and new biologi-cal membranemanner. In treatment process, large bacteria and bacteriamembrane update, adoptbiological carrier, improve the contact eficiency ofmicro- organism and pollutantmatter in sewage.
Wastewater Treatment Process Flow
Raw wastewater first passes through screen equipment and flows into the pre‑aeration equalization tank. Then it is pumped into the integrated biochemical unit: anoxic tank for denitrification, followed by aerobic tank for nitrification to remove BOD₅ and ammonia‑nitrogen. Mixed liquid circulates back for denitrification, while sludge returns to the front‑end. Water then enters the MBR tank, flows to clean‑water tank, and finally goes through UV or sodium hypochlorite disinfection to obtain treated effluent. Excess sludge is discharged to the sludge tank.
PRODUCT FEATURE
1.High Percentage
High percentag of Biomass incontact with wastewater
2.Efficiency
Large amount of activity of microorganisms
Flexibility
Small footprint, suitable for both surface and subsurface installation.
Little Effect
The process is virtually unaffected by the presence of suspended solids.
Item | YMSZ-1 | YMSZ-3 | YMSZ-5 | YMSZ-7.5 | YMSZ-10 | YMSZ-15 | YMSZ-20 | YMSZ-30 | |
capacity(m3/h) | 1 | 3 | 5 | 7.5 | 10 | 15 | 20 | 30 | |
equipment Nm | 1 | 1 | 1 | 1 | 2 | 2 | 2 | 3 | |
Primary settling tank | 1.8 | 5.5 | 9 | 14 | 18 | 27 | 36 | 50 | |
Contact oxidation tank (m3) | 5.0 | 14.5 | 24 | 36 | 44 | 63 | 83 | 130 | |
Secondary settling tank surface load | 1.2 | 1.3 | 1.3 | 1.3 | 1.2 | 1.2 | 1.5 | 1.5 | |
Disinfection tank (m3) | 0.6 | 1.8 | 2.8 | 4 | 5.5 | 8 | 10 | 15 | |
Air blower | model | HC-25IS | HC-30IS | HC-50C | HC-50IS | HC-60IS | HC-80S | HC-100S | HC1-100S |
power(kw) | 0.4 | 0.75 | 1.5 | 2.2 | 2.2 | 3.7 | 5.5 | ||
units | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | |
sewage pump | model | AS10-2CB | AS16-2CB | ||||||
power(kw) | 1.0 | 1.6 | |||||||
Total Weight(t) | 5.5 | 6.5 | 8 | 11 | 17 | 20 | 21 | 29 | |
Occupy area(m2) | 6 | 14 | 20 | 30 | 50 | 65 | 75 | 115 | |
More details and advantages
Equipment accessories and production
100% premiumRaw materials
We use high-quality thick steelplates treated with hot-dipRre orber geaising a service
Compact designwith high integration
All functional units are integrated into
a single carbon steel or stainless steel tank. It can be buried underground or placed above ground, requiring minimal space.
High efficiency with guaranteed water compliance
The water quality is stable,andit is not easy to producesludgeexpansion, which helpsenvironmental
protectionacceptance
We will provide quality products and sincere servicesto create a win-win situation,actoFirst-class production and strict management,Most comprehensive price for you,5reasons lead you to choose us:Green-save energy, long working life, Production for manyyears, strength width,Stable performance and quality assurance,Quality assurance for your
needsFactory direct supply, discount price
Qingdao Yimei Environment Project Co., Ltd. was set up in 2003, located in west coast newDistrict Qingdao City, with a workshop building area of 5,000 m2 and more than 30 kinds oftreating machinery. We are a member of Shandong Province Environmental ProtectionIndustrial Association, have 50 staff members works, including 11 engineers andtechnicians. Since the establishment, we are always committed to environmentalprotection which includes environmental protection equipment design and fabrication,water treatment technological development, engineering construction and technical service.
Our waste water treatment plant have export to many countries, such as America,Australia, Mexico, Russia, Saudi Arabia, Peru, Columbia, Vietnam, Thailand, Philippines,Malaysia, Indonesia, Nigeria, India Chad, Kenya, Iraq, Sudan etc. With stringentspecifications, competitive prices and advanced techniques, we have won a goodreputation among customers. In order to supply good after-sale service, we have set up ourbranch company in America, Malaysia, Australia, Philippines etc. Clients can easily to getthe spare parts. With more than 10 years experiences, oversea install operating team cansupply you best solution with most reliable technology, if you have any problem in wastewater industry, please contact us.
Faq
Q:What discharge standards can the effluent meet?
A:The effluent quality is designed based on the project’s influent water quality, discharge destination and local environmental protection requirements, enabling stable compliance with multiple standards.
Q: What is the lead time? A: It depends on the order quantity. Generally, the lead time is 4 6 weeks.
Q: Is the operation maintenance workload heavy? Does it require a lot of manual labor?
A: It adopts fully automatic PLC control. Aeration, sludge discharge and chemical dosing run automatically. Only simple routine inspection and periodic sludge discharge are required, with very low labor input.
Q: What information is required to get a quotation?
A: Daily treatment capacity, influent water quality, required effluent standard, site conditions and project background. With these data, we can provide customized solutions and official quotations.
Q: How to carry out installation after the equipment arrives at the destination?
A: We will provide you with detailed illustrated installation documents. Technicians can be dispatched for on site assistance if needed. However, visa fees, air tickets, accommodation and technician salaries shall be borne by the buyer.
