Home / News / OEM&ODM / Saudi Project: 150-cubic-meter Integrated Processing System

Saudi Project: 150-cubic-meter Integrated Processing System

Problem: Oily wastewater from oil camps in arid areas, water resources are scarce

Solution: High-efficiency oil-water separation +MBR process, the produced water can be directly used for greening irrigation

Quick Links

About Us

Product Category

Copyright © 2025 Qingdao Yimei Environment Project Co., Ltd. All Rights Reserved.