搜索 (5)
Home / News / OEM&ODM / 20 Containers Pre Installation for 6000 m³/d Saudi System

20 Containers Pre Installation for 6000 m³/d Saudi System

We are excited to share the latest progress on our 6000 m³/d integrated industrial wastewater treatment system destined for Saudi Arabia. Right now, the massive 5‑meter‑tall unit is undergoing pre‑installation and factory assembly at our facility. Once completed, it will be disassembled and packed into 20 standard containers for shipment to the Middle East.

This system is designed to treat 6000 cubic meters of industrial wastewater per day – serving large‑scale petrochemical, manufacturing, or food processing plants. The main structure stands 5 meters high, yet its integrated design allows all treatment stages to fit within a compact footprint.

Pre‑Installation Phase at Our Factory

Before any container is loaded, our engineering team is conducting a full pre‑installation at our workshop. This critical step ensures:

Perfect fit – All components are aligned and tested before disassembly
Leak‑proof connections – Piping and fittings are verified under operating conditions
Control system validation – The PLC panel and sensors are calibrated and run through simulated cycles
Easy on‑site reassembly – Modular sections are clearly marked, and reassembly instructions are prepared

Once pre‑installation is complete, the system will be carefully dismantled, protected for ocean freight, and loaded into 20 containers – ready for the journey to Saudi Arabia.

Integrated Treatment Process

The system combines four proven technologies into one seamless unit:

  • DAF (Dissolved Air Flotation) – Removes oils, grease, and suspended solids with high efficiency.

  • MBBR (Moving Bed Biofilm Reactor) – High‑surface‑area biofilm carriers degrade organic matter (BOD/COD) and nutrients.

  • Tube Settler Clarification – Inclined plates provide rapid solid‑liquid separation in a small footprint.

  • Multimedia Filtration – Final polishing ensures effluent meets Saudi discharge standards.

Why Pre‑Installation Matters

Pre‑installation at our factory significantly reduces on‑site work in Saudi Arabia. Instead of troubleshooting unexpected issues in the field, our client will receive a fully validated system that can be reassembled quickly – saving weeks of construction time and minimizing operational disruptions.

What’s Next

After pre‑installation is finished, the 20 containers will be loaded and shipped. We will continue to share updates, including loading photos and the vessel departure. This project demonstrates our ability to deliver large‑scale, turnkey industrial wastewater solutions to demanding markets like Saudi Arabia.

For more information about our integrated systems or pre‑installation services, please contact our team.

Factory team pre‑installing piping and components
Factory team pre‑installing piping and components
Factory team pre‑installing piping and components
Factory team pre‑installing piping and components
Factory team pre‑installing piping and components
IMG_5117.JPG
{ "@context": "https://schema.org", "@type": "Article", "headline": "20 Containers Pre‑Installation for 6000 m³/d Saudi System", "description": "Pre‑installation of a 6000 m³/d integrated industrial wastewater treatment system (DAF, MBBR, tube settler, filtration) at our factory. The 5‑meter‑tall unit will be packed into 20 containers for shipment to Saudi Arabia.", "keywords": "6000 m³/d integrated system, 20 containers pre‑installation, Saudi industrial wastewater", "author": { "@type": "Organization", "name": "Qingdao Yimei Environmental Engineering Co., Ltd." }, "publisher": { "@type": "Organization", "name": "Qingdao Yimei Environmental Engineering", "logo": { "@type": "ImageObject", "url": "https://yourwebsite.com/logo.png" } }, "datePublished": "2026-04-16", "dateModified": "2026-04-16", "mainEntityOfPage": { "@type": "WebPage", "@id": "https://yourwebsite.com/blog/saudi-6000m3-preinstallation" }, "image": { "@type": "ImageObject", "url": "https://yourwebsite.com/images/saudi-6000m3-factory.jpg", "caption": "Pre‑installation of 6000 m³/d integrated system at factory" } }

Quick Links

About Us

Product Category

Copyright © 2025 Qingdao Yimei Environment Project Co., Ltd. All Rights Reserved.